Home About Contact
vustudents.org
Connect with Facebook


vustudents.org » VU Study Groups By Subject code Wise(Click On Your Subject Code) » CS - (Computer Sciences) » CS615 » cs615 online preparation for final term and midterm mcqs

CS615 CS615 Software Project Management.Download/upload Video Lectures, Handouts, Helping Materials, Assignments Solution, Online Quizzes, GDB, Past Papers, Solved Papers and more….

Download/upload Video Lectures, Handouts, Helping Materials, Assignments Solution, Online Quizzes, GDB, Past Papers, Solved Papers and more….
Reply
  #1  
Old 12-01-2011, 01:48 PM
lubna lolo's Avatar
Senior Member
 
Join Date: Nov 2011
Posts: 325
Default cs615 online preparation for final term and midterm mcqs

Question # 1 of 10

A node on a network schedule is that point in time at which an activity --------------.
Select correct option:
Begins
Begins or Ends (pg 297)

Ends

None of given

REF: A node on a network schedule is that point in time at which an activity either begins or ends.



Question # 2 of 10

A _______ is defined as "the work breakdown that covers the acquisition of a specific defense material item and is related to contractual effort."
Select correct option:
Program WBS (Pg250)
Contract WBS
Contract Program WBS
None of given

REF: A Program WBS is defined as "the work breakdown that covers the acquisition of a specific defense materiel item and is related to contractual effort."



Question # 3 of 10

Using PERT and CPM, ---------------------, helps you complete a project on time. By using these techniques, you can determine the latest time by when an activity should start to be completed on time.
Select correct option:
Individually
Combination

Individual and Combine (Pg 296)
None of given



REF: Using PERT and CPM, individually or in combination, helps you complete a project on time. By using these techniques, you can determine the latest time by

when an activity should start to be completed on time.







Question # 4 of 10

Predecessor activities need to ---------- before the next can begin. After a predecessor activity is completed, the successor activity becomes the predecessor for another activity.
Select correct option:
Both start and end
End (Pg297)
Start
None of given



REF: Predecessor activities need to end before the next can begin. After a predecessor activity is completed, the successor activity becomes the predecessor for another activity.



Question # 5 of 10

A ________ extends the Program WBS to a lower level in order to provide management and cost information to the Government
Select correct option:

Program WBS
Contract WBS (Pg249)
Contract Program WBS
None of given



REF: A Contract WBS extends the Program WBS to a lower level in order to provide management and cost information to the Government.





Question # 6 of 10

Which of the following tools and techniques shows the impacts of one decision over another as well as the probability and cost of each risk along a logical path?
Select correct option:
Simulation
Decision tree
Probability / impact risk matrix
Sensitivity analysis









Question # 7 of 10

To ----------------- risks from occurring, the project team prepares the risk plan before the commencement of the project.
Select correct option:
Avoid (Pg312)
Deal
None of given
Manage



REF: To avoid risks from occurring, the project team prepares the risk plan before the commencement of the project.



Question # 8 of 10

…………. theory when the deliverables of a project are more important than its phases. This normally happens when the deliverables are decided before the project begins.
Select correct option:
Project life-cycle-based
Scheduled
None of given
Deliverable-based (Pg 277)



REF: You use the deliverable-based theory when the deliverables of a project are more important than its phases. This normally happens when the deliverables are decided before the project begins.



Question # 9 of 10

Risk analysis and management are a series of steps that help a software team to understand and manage ----------------------.
Select correct option:
Uncertainty (Pg 305)
Crises
None of given
Problem



REF: Risk analysis and management are a series of steps that help a

software team to understand and manage uncertainty.











Question # 10 of 10

There are ________ types of Work Breakdown Structures.
Select correct option:
None of given
Two (Pg249)
Three
Four



REF: The two types of Work Breakdown Structures.

Question # 2 of 10

Which of the following tools and techniques shows the impacts of one decision over another as well as the probability and cost of each risk along a logical path?
Select correct option:
Simulation
Decision tree
Probability / impact risk matrix
Sensitivity analysis





Question # 5 of 10

Which of the following is displayed as an S-curve?
Select correct option:
Gantt
Cost baseline
Critical path
PERT



REF: The cost baseline is graphically displayed as an S-curve.

















Question # 6 of 10

Over the course of the project, a comparison of the due date and the date delivered provides a metric for how well deliverable dates are ………………. by the project team.
Select correct option:
Met (Pg 274)
Scheduled
None of given
Changed



REF: Over the course of the project, a comparison of the due date and the date delivered provides a metric for how well deliverable dates are met by the project team.



Question # 8 of 10

Each …………. can be subdivided into sub tasks.
Select correct option:
None of given
Program
Task (Pg275)
Project



REF: Each task can be subdivided into sub tasks.



Question#9 of 10
Which of the following tools and techniques shows the impacts of one decision over another as well as the probability and cost of each risk along a logical path?
Select correct option:
Simulation
Decision tree
Probability / impact risk matrix
Sensitivity analysis



Question # 2 of 10

A _______ is defined as "the work breakdown that covers the acquisition of a specific defense material item and is related to contractual effort."
Select correct option:
Program WBS
Contract WBS
Contract Program WBS
None of given



Question # 7 of 10

Which of the following is displayed as an S-curve?
Select correct option:
Gantt
Cost baseline (on web)

REF: The cost baseline is graphically displayed as an S-curve.





Question # 9 of 10

…………. theory when the deliverables of a project are more important than its phases. This normally happens when the deliverables are decided before the project begins.
Select correct option:

Project life-cycle-based
Scheduled
None of given
Deliverable-based (Pg 277)







Question # 10 of 10
Using PERT and CPM, ---------------------, helps you complete a project on time. By using these techniques, you can determine the latest time by when an activity should start to be completed on time.
Select correct option:
Individually
Combination
Individual and Combine
None of given
s�g1�0��o�
Deal
None of given
Manage





REF: To avoid risks from occurring, the project team prepares the risk plan before the commencement of the project.



Question # 8 of 10

…………. theory when the deliverables of a project are more important than its phases. This normally happens when the deliverables are decided before the project begins.
Select correct option:
Project life-cycle-based
Scheduled
None of given
Deliverable-based (Pg 277)



REF: You use the deliverable-based theory when the deliverables of a project are more important than its phases. This normally happens when the deliverables are decided before the project begins.



Question # 9 of 10

Risk analysis and management are a series of steps that help a software team to understand and manage ----------------------.
Select correct option:
Uncertainty (Pg 305)
Crises
None of given
Problem



REF: Risk analysis and management are a series of steps that help a

software team to understand and manage uncertainty.











Question # 10 of 10

There are ________ types of Work Breakdown Structures.
Select correct option:
None of given
Two (Pg249)
Three
Four



REF: The two types of Work Breakdown Structures.

To aid planning, scheduling, and monitoring a project, you can use tools______

Select correct option:

PERT and CPM Timeline

charts and Gantt charts

Both of given (Pg 228)

None of given

REF: To aid planning, scheduling, and monitoring a project, you can use tools such as:

– Program Evaluation and Review Techniques (PERT)

– Critical Path Method (CPM)

– Timeline charts

– Gantt charts



CSOM stands for______

Select correct option:

Computer system operator's manual (Pg 143)

Computer system offered manual

Computer software operator's manual

Computer system obvious manual



REF: Computer system operator's manual CSOM

















The DIDs (Data Item Description) includes a section called ________

Select correct option:

Formal Documentation

Preparation Instruction (Pg 171)

Associated Documentation

Effective Resolution





________ is identifying the specific activities that must be performed to produce the various project deliverables

Select correct option:

Scope Planning Scope

Definition Activity

Definition Activity

Duration Estimating

Activity Definition (Pg 138)



REF: Activity Definition—identifying the specific activities that must be

performed to produce the various project deliverables.



Effective project managers_______

Select correct option:

Lead by example Are visionary

Are good motivators, communicators, supports team members and stand up to upper management where necessary?

All of given (on web)



REF: Chap02 the Project Management and Information Technology Context...





_____ identifying and documenting interactivity dependencies

Select correct option:

Activity Definition Activity

Sequencing Activity (Pg138)

Duration Estimating

Resource Planning

REF: Activity Sequencing—identifying and documenting interactivity

Dependencies.

To expand or contract project scope, to modify cost, or schedule estimates are examples of ________

Select correct option:

Work results

Change request (Pg 156)

Change schedule

Change scope



REF: Change requests. Change requests (e.g., to expand or contract project scope, to modify cost [budgets], or schedule estimates [dates, etc.]) are often identified while the work of the project is being don.





________ is based on soft skills and relies more on human factors, such as collecting information during group discussions

Select correct option:

Source lines of Code (SLOC)

Function Point (FP) Constructive

Cost Model (COCOMO)

Delphi technique (Pg 228)



REF: Delphi Technique: This technique is based on soft skills and relies more on human factors, such as collecting information during group discussions.



The Data Item Descriptions define the formal documentation standards for all required documents generated during the development of software according to standard

Select correct option:

2276

2167 (Pg 172)

1267

2267



REF: The Data Item Descriptions define the formal documentation standards for all required documents generated during the development of software according to standard 2167.









There are _________Planning Process Tasks

Select correct option:

Ten

Thirteen

Fifteen (Pg 138)

Seventeen
Question # 1 of 10

Lessons learned are important to document because an organization can use them to improve future projects and the Project Management process. Therefore, in project closing procedures, it is helpful to review the
Select correct option:
Checklists for risk identification
WBS
Original contract
All of given



Question # 2 of 10
__________ technique used to integrate the project’s scope, schedule, and resources and to measure and report project performance from initiation to closeout
Select correct option:
PMIS
EVM (Pg 154)
Stakeholder skills and knowledge
PV



REF: Earned value management (EVM). A technique used to integrate the project’s scope, schedule, and resources and to measure and report project performance from initiation to closeout.
Attached Files
File Type: pdf CS615FinaltermQuizMCQsolvedbypreciousGirl.pdf (325.0 KB, 21 views)
Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
cs615 preparation material midterm lubna lolo CS615 0 12-01-2011 01:45 PM
cs615 preparing mcqs from here*** lubna lolo CS615 0 12-01-2011 01:40 PM
cs615 midterm fall '10 lubna lolo CS615 0 12-01-2011 01:38 PM
cs615 final term 2010 papers lubna lolo CS615 0 12-01-2011 01:33 PM
cs601 preparation for mcqs complete midterm lubna lolo CS601 1 11-29-2011 01:58 AM


All times are GMT +5. The time now is 10:33 PM.
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.

 

Gravatar as Default Avatar by 1e2.it