MIDTERM EXAMINATION

Spring 2009

CS615- Software Project Management (Session - 3)



Time: 60 min

Marks: 40





Question No: 1 ( Marks: 1 ) - Please choose one

________ identifying which quality standards are relevant to the project and determining
how to satisfy them.

► Quality Planning

► Communications Planning

► Organization Planning



► Staff Acquisition



Question No: 2 ( Marks: 1 ) - Please choose one

These all are outputs of Initiating Process except

► Project Manager Assignments

► Constraints

► Selection Criteria



► Assumptions





Question No: 3 ( Marks: 1 ) - Please choose one

Project management processes can be organized into _____________ groups

► Four

► Five

► Six



► Seven





Question No: 4 ( Marks: 1 ) - Please choose one

Product quality depends on its conformance to ______

► Software requirements

► Development standards

► Implicit requirements



► All of given







Question No: 5 ( Marks: 1 ) - Please choose one

_______is the technical kernel of software engineering

► Design

► Implementation

► Requirements analysis



► Testing





Question No: 6 ( Marks: 1 ) - Please choose one

Mode of specification has a great impact on quality of solution. Forcing SWE to work
with incomplete, inconsistence, or misleading specifications result in
frustration and confusion affecting:



► Quality

► Timeliness and

► Completeness of SW product



► All of given





Question No: 7 ( Marks: 1 ) - Please choose one

Finally, the specification includes a ________

► Bibliography

► Appendix

► Both Bibliography and Appendix



► Reference





Question No: 8 ( Marks: 1 ) - Please choose one

Cognitive model describes a system as perceived by its _________



► User community

► Developer

► Top level management



► Manager





Question No: 9 ( Marks: 1 ) - Please choose one

A review of the Software Requirements Specification is conducted by
________



► Software developer

► Customer

► Both the software developer and the customer



► Top level management



Question No: 10 ( Marks: 1 ) - Please choose one

A meeting is conducted at a _________ and attended by both software engineers and
customers.



► Software engineer site

► Neutral site



► Customer site



► Company site





Question No: 11 ( Marks: 1 ) - Please choose one

The model serves as the basis for the creation of ________ for the Software.

► Design

► Maintenance

► Testing



► Specifications





Question No: 12 ( Marks: 1 ) - Please choose one

Throughout evaluation and solution synthesis, the analyst's primary focus is on

► "What, not "how."



► Model

► Evaluation and Synthesis



► Specification





Question No: 13 ( Marks: 1 ) - Please choose one

In problem evaluation area of effort, once problems have been identified, the
___________determines what information is to be produced by the new system and
what data will be provided to the system.

► Analyst

► Designer

► Coder



► Manager





Question No: 14 ( Marks: 1 ) - Please choose one

Requirements are refined and analyzed to assess their clarity, completeness, and_______

► Correctness

► Consistency

► Concurrency



► None of given





Question No: 15 ( Marks: 1 ) - Please choose one

A software project that meets all the stated objectives is a success of _________





► Project quality

► Project fundamental purpose

► Project management myth



► Project requirement





Question No: 16 ( Marks: 1 ) - Please choose one

All of the following describe the activity list except:

► It’s an extension of the WBS

► It include all activities of the project

► It describe the WBS update



► It include a description of project activities





Question No: 17 ( Marks: 1 ) - Please choose one

Software project are carried out sequentially and that each phase is completed before the
next is taken up.

► The Prototyping Model

► The Incremental Model

► The Waterfall model

► The Spiral model



Question No: 18 ( Marks: 1 ) - Please choose one

Project management is a _________of constant communication and negotiation.

► Process

► Concept

► Practice

► None of given





Question No: 19 ( Marks: 1 ) - Please choose one

These all are design phase activities except

► Output Design

► Input Design

► The software test plan

► Software Selection





Question No: 20 ( Marks: 1 ) - Please choose one

Which organization has set the de facto standards for project management techniques?

► PMBOK

► PMI

► PMA



► PMO

PMA





Question No: 21 ( Marks: 2 )

Give the name of configuration control tools?



Question No: 22 ( Marks: 3 )

Software requirements analysis a bridge between system engineering and software design,
show it by diagram.



Question No: 23 ( Marks: 5 )

Write down the software process player’s names and their roles in projects.



Question No: 24 ( Marks: 10 )

Explain the following terms regarding project characteristics and project dimensions.

· Temporary,

· Unique,

· Aims,

· People,

· Process

1. Quality Function Deployment (5)
2. Formal Technical Review (5)
3. Configuration Control Tools(2)
4. Attributes of Software Design (2)
5. SQA activities. (3)
Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
cs615 past papers with solution midterm lubna lolo CS615 0 12-01-2011 01:36 PM
cs615 final term 2010 papers lubna lolo CS615 0 12-01-2011 01:33 PM
cs615 past papers 2009 spring lubna lolo CS615 0 12-01-2011 01:31 PM
cs507 fall midterm paper lubna lolo CS507 0 11-27-2011 08:58 PM
cs507 midterm fall***2010 lubna lolo CS507 0 11-27-2011 08:15 PM


All times are GMT +5. The time now is 10:32 PM.
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.

 

Gravatar as Default Avatar by 1e2.it